|
Rollout of Windows 2K Our deliverables were to manage the pilot of a Windows 2000 rollout within all client sites, totaling to 7000-targeted users. We managed 7
work streams totalling a team of 20. The Programme deliverables were:
-
1 Club build for the workstations, including
Digital Dashboard Video conferencing Document Management
-
Automated migration scheduler Domain
Infrastructure Exchange 2000 Infrastructure, including e-mail attachment
stripper
-
Active Directory Infrastructure
-
Online Web based training package
-
Produce a Rollout proposal for the Client Build
to 22,000 users
Rollout of
Citrix
Our deliverable was to manage the rollout of Citrix Servers to all of the
clients Call Centers. The Project scope covered access to all client facing
data-stores and internal HR and Financial systems (SAP and Oracle). This
project played a major part in providing a tactical integration of disparate
parts of the clients national estate.
Rollout of Documentation and Knowledge Management
systems
The main deliverable of this project was to deliver a Intranet Centric
Document Management System to the client. The work included from
constructing the user requirements to implementing and managing change
control. The application was put into a pilot with 2000 users, during which
the initial application went through constant change control and
prototyping. Our handover to the client was a workable implementation that
would be ready for group-wide roll out and included training and all
documentation for production handover. We led a testing team that tested
this application on SAN technology – looking at alternatives to server
storage.
|